Business and church lots
Commercial Parking Lots in Harlingen, TX
Lots sized for delivery trucks, graded to drain and striped to code.
- No-cost site visit and written estimate
- Every line of the job priced on paper before work starts
- Drainage and soil checked before a single ton of asphalt is ordered

Built for What Actually Drives on It
Commercial parking lots in Harlingen serve everything from medical offices and retail plazas to churches, schools and apartment complexes. A city of about 72,000 with an interstate on two sides and the Valley's air cargo hub at its airport has a lot of truck traffic, and that traffic finds the parking lot. The first places to fail are almost always the same: entrances, drive lanes where trucks turn, loading areas and the approach to the dumpster.
Heavier where it counts
HomeGuide recommends at least 4 inches of asphalt for commercial lots. That is a floor, not a design. We look at where delivery and garbage trucks travel and build those lanes with more base and asphalt than the parking stalls. On Cameron County clay, the base under truck lanes matters as much as the asphalt thickness.
Getting water off a big flat surface
A large lot on flat ground collects a lot of water, and with Harlingen averaging more than 28 inches of rain a year, ponding is common on older lots. Water sitting on asphalt seeps through cracks and weakens the base, which is how a small pothole becomes a large failed area. We design grades to inlets, curb openings or the street, and fix chronic low spots in the base rather than covering them over.
New lot or rebuild
For new construction, we grade, build the base and pave to a plan. For older lots, we map the failed areas and price options: full-depth repair of the worst areas plus an overlay, or full reconstruction if failure is widespread. HomeAdvisor suggests planning to repave every 15 to 20 years; good drainage and regular sealing stretch that.
Staying open
We phase work so customers, patients or residents still have parking and an entrance. Night or weekend work can be arranged for busy properties, and churches are scheduled around services.
Permits and accessibility
New curb cuts and driveway approaches on Harlingen streets need a city permit under the permit guide, and access onto I-69E or I-2 frontage goes through TxDOT. When the lot is restriped, the Justice Department's guidance is that the 2010 ADA Standards apply to accessible parking, so we lay out the correct number and size of accessible spaces as part of the job.
Maintenance after the paving
A new lot keeps its value with a simple routine: crack sealing every year or two, sealcoat every few years, and restriping when lines fade. We can put that schedule in writing at the end of the job.
Included Options
Commercial work is scoped section by section.
New lot construction
Grading, base and asphalt for new commercial and multifamily sites.
Truck lanes and pads
Heavier sections at entrances, loading areas and dumpster pads.
Full-depth reconstruction
Failed areas removed down to subgrade and rebuilt.
Drainage corrections
Regrading low spots and directing water to inlets or the street.
Phased scheduling
Work planned in sections around hours and services.

Published Parking Lot Prices
| Item | Typical range |
|---|---|
| New asphalt lot, per sq ft (HomeAdvisor) | $2 to $4.50 |
| Per parking space (HomeAdvisor) | $400 to $1,130 |
| Small lot, 10 spaces (HomeAdvisor) | About $10,000 |
| Large lot, 100 spaces (HomeAdvisor) | About $75,000 |
| 200-space lot (HomeAdvisor) | $150,000+ |
Thickness, base repair, drainage work and phasing drive commercial pricing. Figures are national published ranges, not Harlingen quotes. Your written estimate is the price you pay.
From Walk-Through to Reopening
1. Walk-through
We map failures, truck routes and drainage with you.
2. Written scope
Sections, thicknesses, repairs and phasing, priced in writing.
3. Base and drainage
Failed areas rebuilt and grades corrected.
4. Paving
Asphalt placed and compacted section by section.
5. Striping
Layout, accessible spaces and markings painted before reopening.

Commercial Parking Lots Questions
How long does a parking lot project take?
A small lot can be done in a few days. Larger lots are phased over a week or more, depending on how much base repair is needed and how many sections we can close at once.
Can you work at night?
For many properties, yes. We plan noisy work with neighbors in mind.
Will I need to add accessible spaces?
If the lot is restriped, the 2010 ADA Standards apply. For example, a 76 to 100 space lot needs 4 accessible spaces, at least one van-accessible.
Do you pave church lots in Harlingen?
Yes, and we schedule around services and events.
Commercial Parking Lots Service Areas
- Asphalt Paving in Harlingen, TX
- Asphalt Paving in San Benito, TX
- Asphalt Paving in La Feria, TX
- Asphalt Paving in Primera, TX
- Asphalt Paving in Combes, TX
- Asphalt Paving in Palm Valley, TX
- Asphalt Paving in Rio Hondo, TX
- Asphalt Paving in Raymondville, TX
- Asphalt Paving in Lyford, TX
- Asphalt Paving in Santa Rosa, TX
- Asphalt Paving in Los Fresnos, TX
- Asphalt Paving in Brownsville, TX
- Asphalt Paving in Port Isabel, TX
- Asphalt Paving in South Padre Island, TX
- Asphalt Paving in Rancho Viejo, TX
- Asphalt Paving in Olmito, TX
- Asphalt Paving in Laguna Vista, TX
- Asphalt Paving in Los Indios, TX
- Asphalt Paving in Lasara, TX
- Asphalt Paving in Sebastian, TX
Get a Commercial Parking Lots Estimate
Free commercial lot estimates in Harlingen and Cameron County.